We built a house

I wanted to build a simple yet durable house. I especially wanted something that could ride out another typhoon Haiyan/Yolanda. I've been tinkering with a hexagonal design for a couple of years. It's just two stories with 160 square meters interior space. I cleaned up my simple unprofessional drawings, and took them to a real engineering construction company to get an estimate.

They could build the entire project for about 4.5 Million Pesos. This is more than I wanted to spend, so I built it myself.

I hired an independent engineer to draw up the construction plans. I hired the crew myself. I sourced and purchased all the materials, and I did it all for 1.8 Million Pesos.

It took 7 months.

I love my new house. It is awesome.

2 story concrete house



160 square meters



Designed to be proof to all but apocalyptic earth quake and typhoon








Project expenses
ALL in PESOS






04/23/15 Plans $10,000 Civil engineer, John
05/07/15 Plans part 2 $10,000 Civil engineer, John
05/08/15 blue prints $900 NLDT
05/09/15 plumber sign off $2,500 Filiman
05/09/15 electrician sign off $2,500 Filiman
06/01/15 coco lumber $30,000 barangy Cpt. Bro
06/04/15 ReBar Cement(350bags) CHB(2850blocks) etc... $448,470 Margie Grace
06/05/15 structural analysis $1,000 Civil engineer, John
06/08/15 16m3 fine sand $16,000 LAP hardware
06/09/15 16m3 gravel $16,000 LAP hardware
06/09/15 nails $2,200 LAP hardware
06/10/15 Permits $4,400 Biliran
06/11/15 Angle grinder $5,600 Brodeth
06/15/15 cutting wheels $1,000

06/16/15 bender $500 welder
06/18/15 LABOR $14,350 includes cistern
06/23/15 Boulders – 2m3 $2,000 barangy Cpt. Bro
06/24/15 insecticide $3,500 Margie Grace
06/25/15 nails $300 LAP hardware
06/26/15 coco lumber $3,456 barangy Cpt. Bro
06/27/15 plumbing supplies $21,655 Margie Grace
06/27/15 drill $5,200 Margie Grace
06/27/15 LABOR $21,675

07/04/15 bath room set $6,300 Margie Grace
07/04/15 electrical supplies $53,370 Limpiado
07/04/15 LABOR $23,400

07/04/15 coco lumber $7,290 barangy Cpt. Bro
07/04/15 LABOR $9,000 Electrical
07/06/15 gravel 10m3 $12,000 Lilia Hardware
07/06/15 gravel 8m3 $10,400 barangy Cpt. Bro
07/09/15 Sand 8m3 $10,400 barangy Cpt. Bro
07/11/15 LABOR $24,650

07/12/15 plywood, tie wire $5,470 Margie Grace
07/16/15 LABOR $6,000 Electrical
07/17/15 LABOR $21,790

07/20/15 Cement(100) $27,250 Margie Grace
07/23/15 Sand 8m3 $10,400 barangy Cpt. Bro
07/29/15 plywood, nails $2,400 Margie Grace
07/30/15 LABOR $2,000 Electrical
08/01/15 LABOR $14,500

08/06/15 shower and drawers $9,500 Brodeth
08/08/15 LABOR $8,600

08/12/15 sahara and tie wire $3,880 Margie Grace
08/12/15 water tank $9,830 Brodeth
08/15/15 LABOR $15,950

08/16/15 LABOR $3,000 Electrical
08/18/15 Sand 8m3 $10,400 sand man
08/18/15 LABOR $5,360 temp labor
08/19/15 LABOR $3,000 Electrical
08/21/15 tie wire $1,890 Margie Grace
08/22/15 14' truss $4,070 lumber yard
08/22/15 front door $6,300 Margie Grace
08/22/15 lumber for roof $2,188 Margie Grace – P26040 16mm rebar refund
08/22/15 LABOR $18,250

08/24/15 Door knob $5,085 Brodeth
08/24/15 color metal roof $48,170 Margie Grace
08/26/15 sewer pipes $1,740 Margie Grace
08/28/15 pipes $3,340 Margie Grace
08/29/15 LABOR $11,775

08/29/15 electrical conduit $1,300 Margie Grace
08/29/15 LABOR $3,000 Electrical
09/02/15 LABOR $2,000 Electrical
09/03/15 Gravel 4m3 $4,800 Sulla Hardware
09/03/15 LABOR $9,325

09/16/15 Sand 8m3 $10,400 Sulla Hardware
09/17/15 Cement(100) & electrical $31,650 Margie Grace
09/18/15 Shower $1,500 Brodeth
09/19/15 LABOR $11,550

09/22/15 hollow block 500 $6,500 Sulla Hardware
09/23/15 rivits and misc. $1,610 Margie Grace
09/26/15 LABOR $13,850

09/27/15 LABOR $1,500 Electrical
09/30/15 sand 4m3 + grind wheels $5,825 Sulla Hardware
10/03/15 LABOR $11,850

10/06/15 Cement 100 $24,000 Margie Grace
10/08/15 sinks $6,213 Brodeth
10/08/15 bathroom fixtures $760 Margie Grace
10/10/15 LABOR $15,300

10/11/15 waterproofing + misc $2,435 Margie Grace
10/13/15 sand 8m3 $10,400 Sulla Hardware
10/13/15 tile $74,560 Naval Tile
10/15/15 waterproofing $4,560 paint store
10/16/15 diamond wheel $300

10/17/15 doors $18,200 Margie Grace
10/17/15 bath room tile $13,000 Margie Grace
10/17/15 LABOR $12,350

10/20/15 misc $660 Margie Grace
10/22/15 hollow block 80 $1,120 Sulla Hardware
10/24/15 LABOR $16,300

10/26/15 lumber for ceiling $31,000 lumber yard
10/26/15 plywood for ceiling $45,000 Margie Grace
10/29/15 light fixtures $8,040 Brodeth
10/29/15 Cement 100 $23,500

10/30/15 light fixtures $1,120 Margie Grace
10/31/15 LABOR $15,500

11/02/15 nails $140 Margie Grace
11/03/15 sand 8m3 $10,400 Sulla Hardware
11/06/15 hinges $800

11/07/15 cutting wheel & nails $610 Margie Grace
11/07/15 LABOR $12,750

11/08/15 door knobs & lamps $7,100 Margie Grace
11/10/15 windows $65,628 Gemar glass
11/11/15 curtain rods $1,498 Gemar glass
11/11/15 toilet $4,780 Margie Grace
11/13/15 light bulbs $2,260 Margie Grace
11/14/15 LABOR $15,550

11/16/15 Bulbs & electrical $2,600 Margie Grace
11/18/15 plumbing $2,224 Brodeth
11/20/15 electrical $700

11/20/15 sand 4m3 $5,200 Sulla Hardware
11/21/15 LABOR $10,775

11/25/15 tile $9,585 Naval Tile
11/25/15 plumbing $291 Brodeth
11/26/15 Cement 20 $5,300 Margie Grace
11/26/15 Bath room fixtures $8,272 Brodeth
11/26/15 curtains $2,652

11/27/15 cutting wheels $1,100 Margie Grace
11/28/15 LABOR $15,000

12/01/15 hollow block 100 $1,350 Sulla Hardware
12/03/15 Cement 18 $4,890 Margie Grace
12/05/15 LABOR $14,850

12/04/15 cabinet supplies $13,495 Margie Grace
12/07/15 LABOR $2,000 Electrical
12/08/15 cabinet supplies $4,050 Margie Grace
12/10/15 cabinet supplies $6,765 Margie Grace
12/10/15 bar stool $1,400

12/12/15 LABOR $10,050

12/13/15 LABOR $2,500 Electrical
12/14/15 paint $12,000

12/15/15 paint $1,915

12/15/15 plumbing $700 Margie Grace
12/16/15 shelving $500 Margie Grace
12/17/15 misc $355

12/19/15 as built electrical plan $5,000 Filiman
12/19/15 paint $18,990

12/19/15 LABOR $11,850

12/20/15 stove, fans $6,000 Prince
12/23/15 paint $5,044

12/26/15 LABOR $6,275

01/02/16 paint $805

01/02/16 LABOR $8,750

01/05/16 bars and awnings $30,000

01/07/16 LABOR $5,500







Total $1,843,381





















Summary:







Pesos

Bags of cement 768 @ aprox P240 per bag 184,320

Hollow blocks 3530 @ aprox P15 ea 52,800

sand and gravel m3 104 @ aprox P1300 ea 135,200

coco lumber
for scaffolding 41,000

rebar
10, 12, & 16mm 291,800

plywood for forms 40 @330 sheet 20,200

wood for ceiling

76,000

tile

97,560

windows

67,000

LABOR

430,675
















Total

1,396,555

Other/misc

446,826

Total

1,843,381
































ALL in PESOS






06/18/15 LABOR $14,350 cistern
06/27/15 LABOR $21,675

07/04/15 LABOR $23,400

07/04/15 LABOR $9,000 Electrical
07/11/15 LABOR $24,650

07/16/15 LABOR $6,000 Electrical
07/17/15 LABOR $21,790

07/30/15 LABOR $2,000 Electrical
08/01/15 LABOR $14,500

08/08/15 LABOR $8,600

08/15/15 LABOR $15,950

08/16/15 LABOR $3,000 Electrical
08/18/15 LABOR $5,360 temp labor
08/19/15 LABOR $3,000 Electrical
08/22/15 LABOR $17,250

08/29/15 LABOR $11,775

08/29/15 LABOR $3,000 Electrical
09/02/15 LABOR $2,000 Electrical
09/03/15 LABOR $9,325

09/19/15 LABOR $11,550

09/26/15 LABOR $13,850

09/27/15 LABOR $1,500 Electrical
10/03/15 LABOR $11,850

10/10/15 LABOR $15,300

10/17/15 LABOR $12,350

10/24/15 LABOR $16,300

10/31/15 LABOR $15,500

11/07/15 LABOR $12,750

11/14/15 LABOR $15,550

11/21/15 LABOR $10,775

11/28/15 LABOR $15,000

12/05/15 LABOR $14,850

12/07/15 LABOR $2,000 Electrical
12/12/15 LABOR $10,050

12/13/15 LABOR $2,500 Electrical
12/19/15 LABOR $11,850

12/26/15 LABOR $6,275

01/02/16 LABOR $8,750

01/07/16 LABOR $5,500








$430,675